Skip to main content
Historical photograph of the Gaza International Airport passenger terminal and control tower in 2000.

Archive · 2000

Past

The history of Gaza International Airport documented across its planning, inauguration, commercial operational years, and enduring civic memory.

This chronology draws on treaties, contemporary reporting and official aviation records. Evidence and rights details accompany the archive items.

  1. 1994–1997·Documentary record

    Planning and construction

    Gaza International Airport was planned under the 1995 Oslo II Interim Agreement (Annex I, Article XIII), establishing Palestinian civil aviation jurisdiction in the Rafah area. Infrastructure masterplanning and runway design specifications (3,080 m × 45 m) were prepared by Saleh & Hegab Engineering Consultants for the Palestinian Civil Aviation Authority, with construction supported by Palestinian Authority land contribution, soft loans, and international donor grants.

  2. 1998·Documentary record

    Airport opening and state dedication

    Gaza International Airport was officially opened on November 24, 1998, as inaugural aircraft arrived carrying Palestinian leadership and delegations to the new airfield, documented by contemporary news reports. Scheduled commercial passenger service commenced shortly thereafter in early December 1998. On December 14, 1998, U.S. President Bill Clinton and Chairman Yasser Arafat attended the official state ribbon-cutting ceremony and terminal dedication.

  3. 1998–2001·Documentary record

    Years of commercial flight operations

    From late 1998 until regular flight schedules were disrupted in late 2000 and placed under continuous closure in early 2001, the airport served as the operational home base for Palestinian Airlines. According to World Bank transport documentation (Report No. 69315), the passenger terminal was designed for up to 700,000 passengers annually; during 1999, the airfield handled about 60,000 passengers across 1,168 flights, with about 41,000 passengers travelling on Palestinian Airlines on scheduled regional routes including Amman, Cairo, Jeddah, Dubai, Doha, Istanbul, and Larnaca, alongside services by regional airlines.

    Airline pilots and cabin crew pose together in front of a Palestinian Airlines aircraft.
    Palestinian Airlines crew groupOwner historical archive collection
    Several airport counters beneath overhead number signs and pointed architectural arches.
    Passenger processing countersOwner historical archive collection
    Large airport waiting hall with rows of metal seats, pointed arches and glazed service areas.
    Waiting hall with rows of seatingOwner historical archive collection
    Airport security screening equipment including a metal detector, baggage scanner and operator monitor.
    Passenger security screening equipmentOwner historical archive collection
    Blue passport stamp reading Palestinian Authority and Gaza International Airport with the date 8-04-2000.
    Gaza International Airport passport-control stamp, 8 April 2000Owner historical archive collection
  4. 2000–2002·Documentary record

    Airfield closures, shutdown, and infrastructure destruction

    Following the outbreak of the Second Intifada in late September 2000, Israeli authorities closed the airport on October 8, 2000, followed by a brief reopening on October 19, beginning a period of intermittent closures. On February 25, 2001, authorities placed the airfield under continuous closure, as documented by UN reports. In December 2001, military air strikes destroyed the radar installation and control facilities, and in January 2002, military bulldozing tore up the runway, rendering the airfield inoperative. On March 13, 2002, the Council of the International Civil Aviation Organization (ICAO) adopted a formal resolution strongly condemning the destruction of Gaza International Airport and its air navigation facilities.

    Long row of freestanding airport arches leading toward a ruined building under a blue sky.
    Ruined airport colonnadeOwner historical archive collection
  5. 2002–present·Documentary record

    Civic memory and site documentation

    Following the cessation of flight operations and subsequent destruction, the history of Gaza International Airport has been preserved through civic memory, legal records, and dated documentary imagery. A June 13, 2008 field photograph by Gisha Access records the damaged terminal walls and surviving architectural dome at Rafah, documenting the physical condition of the site years after its destruction.

    Documentary photograph of the destroyed passenger terminal and architectural dome at Gaza International Airport in 2008.
    Gaza International Airport Passenger Terminal RuinsGisha Access
External archival video

Watch the archive

Archival television broadcasts, newsreels, and historical footage of Gaza International Airport.

GAZA: INTERNATIONAL AIRPORT OPENS

Watch at original source
AP Archive1998-11-24

GAZA: INTERNATIONAL AIRPORT OPENS

Archival news coverage documenting the official opening ceremony and inaugural flights on November 24, 1998.

Watch at original sourcesrc-video-ap-1998-opening

Pres. Clinton and Chairman Arafat at Gaza Airport (1998) (FOIA 2017-0234-F)

Watch at original source
William J. Clinton Presidential Library1998-12-14

Pres. Clinton and Chairman Arafat at Gaza Airport (1998) (FOIA 2017-0234-F)

Official White House videotape documenting the state ceremony with President Bill Clinton and Chairman Yasser Arafat on December 14, 1998.

Watch at original sourcesrc-video-clinton-1998

Al Jazeera: Destroyed Yasser Arafat International Airport (2009)

Watch at original source
Al Jazeera Arabic2009-02-13

Al Jazeera: Destroyed Yasser Arafat International Airport (2009)

Field report by Abbas Nasser from the ruins of Yasser Arafat International Airport, broadcast February 13, 2009.

Watch at original sourcesrc-video-aljazeera-2009

AFP: Destroyed Gaza Airport Symbolises Grounded Peace Hopes (2018)

Watch at original source
AFP News Agency2018-09

AFP: Destroyed Gaza Airport Symbolises Grounded Peace Hopes (2018)

AFP retrospective report marking 25 years after Oslo, documenting the destroyed condition of Gaza airport.

Watch at original sourcesrc-video-afp-2018

Sources & archive metadata

Historical milestones link to supporting sources; each archive item records its evidence and rights status.

The published chronology links to its historical sources. Further archive material remains under review.

United Nations / Government of Israel and PLOsrc-oslo-ii-1995

Israeli-Palestinian Interim Agreement on the West Bank and the Gaza Strip (Oslo II), Annex I: Protocol Concerning Redeployment and Security Arrangements, Article XIII (Security of the Airspace)

Primary diplomatic framework establishing the legal basis, security arrangements, and civil aviation jurisdiction (Article XIII) for Gaza International Airport in the Rafah/Dahanieh area.

View source document
Saleh & Hegab Engineering Consultantssrc-saleh-hegab-airport

Gaza International Airport — Project Portfolio (Transit System: Airports & Harbors)

Engineering firm portfolio documenting planning and infrastructure design for Gaza International Airport (Rafah, Client: Palestinian Civil Aviation Authority) with design runway specifications (3,080 m x 45 m).

View source document
World Banksrc-worldbank-2007

West Bank and Gaza - Transport Sector Strategy Note

Official World Bank transport policy note (Report No. 69315, Project ID P100971, October 30, 2007). Section 2.5 (pp. 25–26) and Annex 6 (pp. 88–92) document airport construction supported by Palestinian Authority land contribution, soft loans, and international donor grants (Section 2.5 notes an estimated $86.5M total cost with 46% grants, 45% soft loans, 9% PA self-financing; Annex Table 20 itemizes $86.7M accomplished expenditures: $7.4M PA land contribution, $39.6M soft loans from Egyptian banks and Spain, and $39.7M grants from Germany, Spain, Saudi Arabia, and Netherlands including aircraft donation), 700,000 annual passenger design capacity, 1999 traffic (about 60,000 total airport passengers across 1,168 total airport flights; about 41,000 passengers travelled with Palestinian Airlines), scheduled Palestinian Airlines routes (Amman, Cairo, Jeddah, Dubai, Doha, Istanbul, Larnaca), regional carrier services (Royal Wings, EgyptAir, Royal Air Maroc, Tarom), and damage assessments.

View source document
The New York Timessrc-ap-1998-opening

Palestinians Walking on Air At Opening of Gaza Airport (The New York Times / Deborah Sontag)

Contemporary press report documenting the official opening and inaugural aircraft arrivals on November 24, 1998, published in The New York Times on November 25, 1998.

View source document
The Washington Postsrc-ap-1998-clinton

Clinton Cuts Ribbon at Gaza Airport (The Washington Post / John M. Goshko)

Documented official ribbon-cutting ceremony and VIP terminal dedication on December 14, 1998 attended by U.S. President Bill Clinton and Chairman Yasser Arafat, published in The Washington Post on December 15, 1998.

View source document
AP Archivesrc-video-ap-1998-opening

GAZA: INTERNATIONAL AIRPORT OPENS

Contemporary Associated Press television news footage documenting the official opening of Gaza International Airport and inaugural aircraft arrivals on November 24, 1998.

Watch at original source
William J. Clinton Presidential Librarysrc-video-clinton-1998

Pres. Clinton and Chairman Arafat at Gaza Airport (1998) (FOIA 2017-0234-F)

Official White House Communications Agency (WHCA) archival videotape footage, released under FOIA request 2017-0234-F by the William J. Clinton Presidential Library (uploaded August 30, 2017). Documents the arrival and state ceremony with U.S. President Bill Clinton and Chairman Yasser Arafat at Gaza International Airport on December 14, 1998.

Watch at original source
Office of the United Nations Special Coordinator in the Occupied Territories (UNSCO)src-unsco-2000

The Impact on the Palestinian Economy of the Recent Confrontations, Mobility Restrictions and Border Closures, 28 September–19 October 2000

Official UNSCO report documenting mobility restrictions, recording the initial closure of Gaza International Airport on October 8, 2000, and its temporary reopening on October 19, 2000 (footnote 3).

View source document
United Nations General Assemblysrc-unrwa-2001

Report of the Commissioner-General of the United Nations Relief and Works Agency for Palestine Refugees in the Near East (1 July 2000–30 June 2001), A/56/13

UN General Assembly Official Records, Fifty-sixth Session, Supplement No. 13 (A/56/13, paragraph 141), documenting that after intermittent closures beginning late September 2000, Israeli authorities placed Gaza International Airport under continuous closure starting February 25, 2001.

View source document
United Nations / International Civil Aviation Organization (ICAO)src-icao-council-2002

Destruction of Gaza International Airport — ICAO Council resolution — ICAO press release (13 March 2002)

ICAO Council resolution adopted March 13, 2002 strongly condemning the destruction of Gaza International Airport and its air navigation facilities as a violation of international aviation conventions.

View source document
Wikimedia Commons / Gisha Accesssrc-gisha-2008

Gaza AirPort, Gaza — Documentary Photograph of Terminal Ruins (June 13, 2008)

Licensed CC BY-SA 2.0 Generic documentary photograph recording the destroyed passenger terminal and architectural dome at Gaza International Airport. Captured June 13, 2008.

View source document